Search Results for 'Hammond Lane Foundry'

2 results found.

The White Bridge

image preview

This photograph of the Galway-Clifden railway bridge over the river was taken from the west side, looking towards Bohermore. It was built in 1894 and consisted of three spans of 150 feet with a 21 feet span in the centre. This centre one was a lifting one on the bascule principle to allow for navigation of boats and steamers from the sea and canal to the lake.

‘A ghostly presence through trees and over bog’

image preview

One of Ireland’s great engineering feats in the 19th century was the building of the Galway - Clifden railway. After 30 years of argument as to which was the best route, the first train steamed out of Galway to Oughterard on January 1 1895; and the final section to Clifden was finished by July of that year.

 

Page generated in 0.0366 seconds.